#openstack-meeting: Monasca Team Meeting

Meeting started by witek at 14:00:52 UTC (full logs).

Meeting summary

    1. https://etherpad.openstack.org/p/monasca-team-meeting-agenda (witek, 14:03:33)

  1. Specifications repository (witek, 14:03:47)
    1. https://review.openstack.org/498804 (witek, 14:10:35)
    2. http://docs-draft.openstack.org/04/498804/4/check/gate-monasca-api-docs-ubuntu-xenial/715a60c//doc/build/html/contributor/index.html (witek, 14:11:01)

  2. Open Stage (witek, 14:13:34)
  3. mid-cycle (witek, 14:14:50)
  4. TSDB (witek, 14:18:56)
    1. https://etherpad.openstack.org/p/cassandra_monasca under Hardware Requirements (nseyvet_op5, 14:28:15)
    2. https://julien.danjou.info/blog/2015/gnocchi-benchmarks (witek, 14:49:46)
    3. https://www.slideshare.net/GordonChung/gnocchi-v3/18 (witek, 14:49:56)


Meeting ended at 14:59:58 UTC (full logs).

Action items

  1. (none)


People present (lines said)

  1. witek (72)
  2. rhochmuth (25)
  3. nseyvet_op5 (19)
  4. jgu (11)
  5. shinya_kwbt (8)
  6. sc (5)
  7. openstack (3)
  8. cbellucci (1)


Generated by MeetBot 0.1.4.