=========================================== #openstack-meeting-4: Compass Status Syncup =========================================== Meeting started by xichengc at 01:02:23 UTC. The full logs are available at http://eavesdrop.openstack.org/meetings/compass_status_syncup/2015/compass_status_syncup.2015-09-10-01.02.log.html . Meeting summary --------------- * upstream ansible status (xichengc, 01:02:51) * we have finished deploying AllinOne Openstack by OSAD (chigang, 01:04:14) * but speed is too low (chigang, 01:04:46) * ACTION: wshao and chigang to raise the installation speed question to the openstack-dev mailing list (xichengc, 01:05:57) * ACTION: wshao to conduct research on the possibility of having two phases of installation: build and install (xichengc, 01:15:46) * status on OSAD as a compass plugin (xichengc, 01:16:26) * ACTION: baigk to provide parameters to gyu for OSAD integration (xichengc, 01:25:30) Meeting ended at 01:30:21 UTC. Action items, by person ----------------------- * chigang * wshao and chigang to raise the installation speed question to the openstack-dev mailing list * gyu * baigk to provide parameters to gyu for OSAD integration * openstack * wshao and chigang to raise the installation speed question to the openstack-dev mailing list * wshao * wshao and chigang to raise the installation speed question to the openstack-dev mailing list * wshao to conduct research on the possibility of having two phases of installation: build and install People present (lines said) --------------------------- * xichengc (29) * wshao (23) * chigang (7) * chenshuai (5) * rockyg (3) * gyu (3) * openstack (3) * xuhan (1) Generated by `MeetBot`_ 0.1.4